We do simulated power failures once a year on a warm day for two hours with all loads applied including on-site transmitters.

It's one of the top things mission critical facilities perform with some diligence.  Especially if they have UPS/UBS systems to sustain ops during the transition. It's a system of components.Test test test.

MM