Warren...was the cabling between the base and fixtures in conduit? MM > I took have seen a fellow broadcaster spend thousands of dollars with > replacment LED beacon parts and the tower labor to transport up and down > tower. Something to be said for a light bulb! Products are not ready for > prime time on AM towers. > > Warren Shulz > WLS Chicago >