[BC] Dead air or no air...

Lotus Engineering loteng at lvradio.com
Tue Mar 10 19:03:59 CDT 2009


In our old studios it was cats giving all 9 lives on the pole pig 30 Ft in the air that put us on generator several times.  Thank God the new studios have power underground.
Bill

Bill Croghan CPBE WBØKSW
Chief Engineer, 
KOMP/KXPT/KENO/KBAD/KWWN/KWID
Lotus Broadcasting, Las Vegas, NV

>>>>snip<<<<<<
> > sitting in pitch dark. Power came on within 45 minutes. A squirrel
> got  across the transformer and was vaporized said the power company worker who
>>>>snip<<<<<
> lights were still on. Turns out a bird decided to commit suicide on the
> pole, > taking out one of the 3 phases that Ol' bessie needed. I forget how
>>>>snip<<<<<




More information about the Broadcast mailing list